Wavendon Gate School

Customer/Organisation: Milton Keynes

Start Date: July 2022

Completion Date: September 2022

Contract value: Circa £90,000

Description of Contract

  • Strip out of existing pipe work and boilers
  • Install 3 Idea Evo Max 60 Boilers
  • Install heating Pipe work.
  • Insulate all pipe work.
  • Install late heat exchanger.
  • Install new boiler flue.
  • Replace the existing Boiler Control with an upgraded panel that can be controlled by on site team.
  • Replace the heating pressurisation unit.
  • Replace the chemical dosing pot.
  • Replace the dirt and air separator.
  • Replace the LTHW circulating pump.
  • Install valves and ancillaries.
  • Install domestic hot water services.
  • Install fire stopping associated to the heating and domestic service installations.
  • Testing of Gas Installation and commissioning of the controls.
  • Provide training to the onsite team.